CipherTech HQ · Facility schematic v2.4
Facility blueprint
Two floors, fourteen badge readers, two ways out of the building. Reader names below match the
door column in door_logs exactly.
Building exit reader
Interior badge reader
Restricted area
Floor 2 · Restricted
Badge-only from the stairwellFloor 1 · General access
Two building exitsReader index
| door (as logged) | Floor | Notes |
|---|---|---|
Main Lobby | 1 | Building exit. Turnstiles log ENTRY and EXIT. |
Loading Dock | 1 | Building exit. Alarmed roll-up door, see helpdesk_tickets. |
Reception | 1 | Staff side of the front desk. |
Floor 1 Hallway | 1 | Interior. |
Sales Bullpen | 1 | Interior. |
Guard Post | 1 | Security staff. |
HR Office | 1 | Restricted. |
Breakroom | 1 | Interior. |
Floor 2 Hallway | 2 | Stairwell/lift landing. The only way onto floor 2. |
Engineering North | 2 | Interior. |
Engineering South | 2 | Interior. |
Server Room | 2 | Restricted. |
R&D Lab 1 | 2 | Restricted. Project Chimera benches B1–B4. |
R&D Lab 2 | 2 | Restricted. |
Readers log a swipe in the direction the person is heading. Tailgating isn't logged, and neither is walking through a door someone else is holding open.